More Progess at Halfaya

By John Lee.

The Missan Oil Company has finished drilling one of the new wells at the al Halfaya field.

Director General of the company, Ali Imurig Soadj, said that the BOHI company, contracted by Petrochina, completed the HF-107-K107 well at the al Mushrif reservoir.

Thirty-five wells have been drilled at Halfaya, including 8 old wells which have been repaired.

Production at the field is now about 122,000 barrels per day, of which about 105,000 bpd are exported from Basra.

(Source: Missan Oil Company)

Comments are closed.