Iraq's Ministry of Transport has announced that the Nasiriyah International Airport project has reached over 56% completion, with significant progress following the resolution of obstacles faced by the Chinese contractor.

Key Data:

  • Project: Nasiriyah International Airport
  • Completion Rate: 56%
  • Total Workers: 450
  • Machinery in Use: Over 120 units
  • Main Buildings:
    • Passenger terminal (20,000 sqm, 2 floors: departures and arrivals)
    • VIP lounge (2,000 sqm)
    • Control tower (42 meters tall)
    • Air navigation staff housing
  • Runway:
    • Length: 3,400 meters
    • Load capacity: PCM 87
    • Taxiway length: 3,400 meters
  • Airport Capacity:
    • Initial: 750,000 passengers annually
    • Phase two (after 10 years): More than 2,500,000 passengers annually
  • Aircraft Gates: 3
  • Aircraft Parking Capacity: More than 8 planes
  • Additional Facilities:
    • Fuel station
    • Water desalination station
    • Power station
    • Civil defense center
  • Standards Compliance: Civil Aviation Authority, ICAO

(Source: Ministry of Transport)