Iraq-Turkey Pipeline Flow Restored after 12 Years

By John Lee.

Crude oil has resumed flowing through a section of the Iraq-Turkey Pipeline (ITP) after a 12-year halt.

Oil Minister Basim Muhammad Khudhair al-Abadi announced on Tuesday that pumping had restarted from station IT1A [West Al-Fatah Station, Baiji] through the 46-inch diameter line to measurement station MS.

According to the Ministry of Oil, the work was carried out by engineers at North Oil Company (NOC) without foreign assistance.

An attack by the Islamic State group (ISIS, ISIL, Daesh) in 2014 badly damaged the line.

(Source: Ministry of Oil)

No comments yet.

Leave a Reply