Gazprom Neft is to conduct a 2D seismic survey on the south-eastern section of the Halabja block. The technical equipment and personnel required for the survey are currently being transferred from the south-western section, where the company has already successfully completed a survey spanning 225 linear km. 2D seismic surveys covering approximately 870 linear km […]
Gazprom Neft to Conduct Seismic Survey
