New Bridge Completed in Samarra

By John Lee.

Iraq's Minister of Housing and Construction, Mohamed Sahib al-Daraji [Mohammed Al-Deraji] (pictured), has announced the completion of a concrete bridge in Samarra, in Salahadin province.

In a statement he said the bridge was 384 meters long and cost 21 billion Iraqi dinars ($18 million).

(Source: Aswat al-Iraq)


Deprecated: related_posts is deprecated since version 5.12.0! Use yarpp_related instead. in /srv/users/ibn/apps/ibn/public/wp-includes/functions.php on line 5211

One Response to New Bridge Completed in Samarra


  1. Notice: Only variables should be assigned by reference in /srv/users/ibn/apps/ibn/public/wp-content/plugins/subscribe-to-comments/subscribe-to-comments.php on line 590
    Annie Miller
    4th November 2012 at 02:56 #

    That is great news and I hope that bridge will make travelling to and from places faster and easier for the people.